This scaffold is the expanded version of the Zippy mobile scaffold. By adding extra frames and guardrails, and other components, the working height can reach 6m for more works that need higher access.
Platform height: The distance between ground and the surface of the top platform.
Total height: The height from ground to the top of the scaffold. Usually add 1m on platform height.
Working height: The maximum height that a person can reach while standing on the top platform. Usually add 1m on total height.
When everyone makes the same style, we make it better
Tested under EN1004:2020 standard by TUV or AS/NZS1576.3 by SGS, you can rest assured what you receive are aluminum scaffolds with trusted quality and excellent performance.
We use high grade 6061-T6 aluminum alloy to manufacture our mobile aluminum scaffolds, with 260N/cm² yield strength, 290N cm² tensile strength. All for ensuring durable and solid quality.
Easy operated braces. With renewal clip design, it can wrap more than 50% of the vertical tube, ensuring it won’t be kicked off or loose after assembly.
Strong aluminum toe board can stand 150N horizontal force with 17mm deformation, less than 35mm as EN1004 requested. Having stoppers on folding toe board to prevent inner fold and locate position at the same time.
Solidly constructed to reach over 275KG/㎡ load capacity, our platforms are made of a strong aluminum frame and 10mm thick anti-slip & waterproof birch core plywood, no peeling in humid, hot, cold, or dry climates. What’s more, the trapdoor is reinforced with aluminum frame to prevent sticking up at one end, the hinge is made of zinc plated steel, no aging and shedding like woven fabric.
100% rust free. All platforms are equipped with one piece machined platform hook and quick set retractable wind-lock. The hook is bolted on with 304 grade stainless steel bolt&safe lock nut.
Using an elastic clip to stop the feet from going back is not enough, the outriggers are equipped with security nut to make sure it won’t be loose. Sizes vary from 2m to 4m length (even more), and 600mm adjusting distance.
Ladder with gravity lock optional. Since the local scaffold regulations are various in different markets or countries, you can choose to add a ladder with a gravity lock or stabilizers as you need. our specially designed gravity will lock automatically when the ladder is set on the scaffold frame. The ladder can’t be lifted up after the lock is activated.
The folding scaffold is assembled with four pieces of 5 inch(6 inch available) nylon caster wheels, 200KG safe working load of each caster.
Our folding mobile scaffolds can be quickly folded within 4 steps, are extremely easy to use, and don’t require any tools to assemble or dismantle. Fits through most doorways and in vans or ute, and can be used as a workbench, work stand, and a trolley.
From incoming material inspection to final inspection, we have our professional inspection team to make sure our scaffold quality is always under control.
When the materials arrived to our warehouse, we will do ISO standard inspection to check the size, thickness, treatment, quantity, etc, all according to controlled drawing and technical requirements. To decide it can be accepted or should be rejected.
A key action to keep quality under control, ISO standard during production inspection is critical and can never be skipped off. We check the sizes and function of all scaffold components according to the drawings and technical requirements, to avoid unnecessary re-work and potential problems.
We do product test according to EN1004:2020 standard, both components and whole set scaffold.
In the middle of mass production process, we always assemble one set of scaffold to confirm if the sizes are correct and all components can fit well.
A container with mixed scaffold items has arrived to your warehouse, and you need to find out the right parts to set up a scaffold first, as a sample to be shown to your customers. But it’s really painful to sort out which component belongs to which scaffold, that you have to count the rungs of a frame and measure the sizes.
We have a simple but efficient method packed together with your goods, to save tons of time. With this, you can immediately find all the correct parts while you are unloading your goods. Most importantly, you won’t miss any pieces of them.
Generally, we use shrink wrap and carton papers/boxes to wrap the scaffold parts. However, we take an extra move: we put Scaffold manual and scaffold check list in each caster’s carton box, and it’s for free! For your brand marketing and selling, we put label/bar code as per your request, we also have solution for areas with strong UV rays or rainy weather.
Usually one 40 feet HQ container can load 73 m³, one 40 feet container can load 68 m³of goods and 32 m³ for one 20 feet container. For all of our products, we have detailed container loading information for you.
Unlock our competitive price, efficient communication, professional service, on time delivery, and more!
No matter it’s for commercial, industrial or home improvement, universal or special aluminum scaffold, we are always here to provide solutions to you.
No jobs are too big or too small! No matter it’s different specifications or a change on the spigot, we are able to provide you the solutions.
Automated page speed optimizations for fast site performance